CEDARS-SINAI MEDICAL CENTER
Los Angeles, CA
"New construction for multiple research departments and programs including Bio-Medical, Neurology, Neurosurgery, Regenerative Medicine, Cardiology, and Barbara Streisand’s Women’s Heart Center
PROJECT DETAILS
100,000 SF
Relocation within active medical center campus
Completed move during final construction phase
17 month duration, 2-month phased move"
SANTA CLARA UNIVERSITY
Santa Clara, CA
"Visions Management was engaged in a new construction project for the teaching and research laboratories for Biology, Chemistry, Physics, Psychology, Neurology, and STEM. Additional lab spaces for Electrical, Mechanical, Robotics, Environmental, and Civil Engineering.
PROJECT DETAILS
270,000 SF
Moving multiple, complex departments during the COVID-19, Occupied space
18 month duration, 5-month phased move"
STANFORD CHEM H
Palo Alto, CA
"New research complex for teaching and research laboraties. The new complex consists of four floors with over (30) laboratories, shared research facilities, meeting spaces, communal spaces and a pub. The labs consists of cell and molecular biology, chemistry, imaging and microscopy, electrophysiology and behavior, human neuroscience, engineering and a wide variety of neuroscience techniques. Our relocation efforts included the transition of existing content, equipment, chemicals, technology and furniture into classrooms, labs, research, study and office space.
Moving multiple, complex departments during the Covid -19 pandemic and during active university classes within the new building
No loading dock, relocation required special permits to drive on campus, coordination with campus parking and security.
Utilized street, fire lanes and underground tunnels for moving
Project Duration: Total 18 months including a multi-phased schedule"
VITALANT
San Francisco, CA
With the opening of Vitalant’s new San Francisco location, the Visions Management team managed the inventory, planning and relocation of all equipment and employees into the new 33,000SF facility. Over 700 pieces of equipment were managed with limited down time. Our team also manage all seismic anchoring efforts. The new facility provides modern and innovative lab space for the Research Institute to conduct advancing blood safety world wide through scientific research and education.